The correct installation of the box-type transformer is the key to the correct use of the equipment in the subsequent process. Following the operation instructions can avoid vague failures due to improper installation during use, and reduce the frequency of downtime for maintenance.


1、The box transformer is mainly composed of natural wind and circulating cooling. Therefore, there should be no illegal stacking around it, especially the transformer room door should not be blocked, and the shutters should be regularly removed for ventilation and the attachments on the sub-holes to ensure that all electrical equipment does not exceed the allowable temperature.

2、The floor of the box-type substation should be placed in a higher place, not in a low-lying place, so as to avoid rainwater pouring into the box and affecting the operation of the equipment.

3、Zinc oxide arresters should be installed in the high-voltage distribution room of box-type transformers, and the installation method should be convenient for testing and disassembly and replacement.

4、The box door of the box-type substation should be opened outward, and there should be handles, secret doors and locks, and the secret doors and locks should be rust-proof

5、The noise level of the box-type substation shall not be greater than the specified noise level of the transformer. Regardless of whether the box shell is made of metal or non-metallic materials, the metal frame of the box body should be well grounded, with grounding terminals, and marked with a grounding symbol

6、

The transformer room should be dominated by natural ventilation, and the relationship between the temperature in the box and the output of the transformer should be given. The transformer room can be equipped with room temperature monitoring devices and self-starting ventilation and cooling devices as required to ensure that the transformer is under the specified environmental conditions.

run at full capacity. The transformer should be accessible from the top of the box or from the side doors.

7、The grounding and neutral line of the box-type substation share a grounding grid. The grounding grid is generally grounded at the four corners of the foundation, and then connected into one. The box-type substation and the grounding grid need to have two reliable connections. During the installation process of the box-type substation, attention should be paid to selecting the appropriate location and avoiding damage to the equipment caused by the external environment, which can prolong its service life, improve work efficiency, and bring better benefits to the enterprise.




Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 亚洲黑人av| 极品熟女精品| 丰满人妻一区二区三区在线视频53 | 亚洲v无码一区二区三区四区观看 日韩a片无码毛片免费看 | 午夜av一区二区三区| 亚洲性XXXX丝袜护士HD| 欧洲丰满熟女a片| 亚洲一区二区偷拍| 亚洲天堂中文| 日韩免费av在线播放| 亚洲日韩第9页| av十大喷潮女神| 一区二区三区免费视频播放器| 69精品人人人| 第一福利精品导航| 成人视频XXxx| 多人乱p视频在线免费观看| av在线一区二区三区四区| av激情网| 日韩av日韩| 色偷偷中文字幕综合久久| 99在线精品国自产拍不卡| 国产二级看片| 国产精品久久久久久久久久久免费看 | 亚洲欧美日韩中文在线制服| 阜新市| 亚洲欧美日韩在线播放| av不卡一区二区三区| 色 亚洲 日韩 国产 综合| 一本一道人人妻人人妻αv| 性乌克兰xxxx极品| 青娱乐极品视觉盛宴国产视频| 四虎国产成人永久精品免费| 少妇被粗大的猛烈进出| 上饶市| 日本亚洲成a人片在线观看| 深夜免费福利视频| 黑人猛挺进小莹的体内视频| 国产成人无码a区在线观看视频 | 朔州市| 亚欧在线视频|